Velodrome Stadium

Specifications: EN14399-4 10.9 K2 standard.

Tons: The entire roof is made of 5,500 t of steel and it was designed with steel cables (about 55 km of pipes).

Finish: structure was designed to be fixed with bolts on site and with Hot-Dip Galvanization as anti-corrosion protection.

Project: The central element in the stadium renovation is the new roof. It is a 5,500 ton three-dimensional steel structure, which rises to a height of 65 m at its highest point.

 

Start date: September 2011

Completion date: September 2014

Date:

Category:

Tags: